Acon Bua Presses Energy Ministry Over Unconnected Power Poles in Otuke

What the report says
Kampala, Uganda — Otuke East MP Julius Acon Bua has urged the Energy Ministry to speed up long-delayed electricity connections in Otuke District, saying power poles installed years ago have still not been linked to wires. The issue was raised during a parliamentary sitting on Wednesday, according to Dokolo Post, which reported that Otuke was among the early areas covered under a rural electrification push following a 2019 government directive.
Acon said the unfinished network has left many communities without access to electricity even though the basic infrastructure is already in place. He argued that the delay is holding back local economic activity, particularly for young people who might use power for small businesses such as welding and carpentry. He also said electricity could help improve water access by running pumps in parts of the district.
The MP further warned that some of the unconnected poles are being damaged by wildfires, raising concerns that existing investment could be lost before residents benefit from it. He said repeated appeals over the years had not solved the problem and pressed the ministry to intervene.
More broadly, rural electrification projects across Uganda often face implementation gaps between pole installation and actual household connection, which can delay expected social and economic benefits. In this case, the reported concern is that Otuke residents remain unable to use infrastructure that was meant to bring power to the district.
Loading debate for this article…
Other publishers covering this story
No additional verified coverage is currently clustered with this report.

Farmers seek tighter regulation of agricultural equipmentThe Independent Uganda
Ministry of Foreign Affairs welcomes Charles Ssentongo; Diaspora Department seeks stronger diaspora policyWatchdog Uganda
Who Is to Blame for Broken Roads and Poor Services? What Uganda’s Local Governments Act SaysWatchdog Uganda
Ssekandi Hails Hajj Yunus Kakande on Retention as OP Permanent SecretaryWatchdog Uganda
How One Missing Part Costs Airlines Millions: Aviation Expert Ben Cupidi Unpacks AOG CrisesWatchdog Uganda
Kampala Traders Seek Urgent Meeting with URA Commissioner General Over Rising Taxes, Business ChallengesNile Post